CLEAN AIR SOLUTION PROJECTS

Retrofit Milestone of Our Principal AAF

Gas Turbines Air Intake is exposed to dust, dirt, cyclic exposure to fog, & moisture. High DP reduces engine output and fuel economy. An advisory investment in filters for cleaner combustion air will enhance performance and profitability.

Supply Contracts For Air Filters- Gas Turbine

SAF International coordinated M/s Engro Polymer & Chemical Ltd. for the supply of the inlet duct, Elbow, Silencer & trash Screen for installation Hitachi H-25 Gas Turbine by AAF International replacing the worn-out equipment for optimum performance.

Project Name: K-Electric BQPS-II 560 MW K-Electric's flagship 560 MW

Scope: (BQPS-II) is the first-ever Pakistani power plant to be declared as WWF-Green Office for its Environmental Management System which prioritizes energy efficiency focuses on waste reduction across the entire value chain and ensures an environmentally -friendly workplace. (BR Jul 30, 2018). SAF sound experience in Gas Turbines Air Intake Filtration system developed the confidence in the industries with AAF International. SAF has a regular supply contract and feels proud to provide solutions for the GE Frame 9E Gas Turbines air filter. K-Electric has trusted and exhibit confidence with SAF for supply of filters resulting a long business association that lowering the overall cost-per-kilowatt.

Client: K-Electric

Location: Karachi-Pakistan


Clean Air Solution-Retrofit Service Optimization Gas Turbine

Project Name: Gas Turbine Filter Intake House 5.7MW Taurus T-60

Challenges & Problems Faced by Client:

The dusty environment was the root cause of frequent change of Combustion filters installed at Gas Turbine Air intake at Gatro Power Hub Balochistan. Heavy Dust load on the air filters caused a sharp increase in pressure drop, consequently, frequent change of filters was indispensable. This condition was quite challenging for them because of the increased outage time of the machine.

SAF Design & Solution:

A dynamic team of SAF International presented a solution to optimize the Gas Turbine intake, Retrofitting of Pre-Filter at Solar Turbines Turbomach Gas Turbine Taurus T-60 (5.7MW) complete single-stage filter house with Louvers steel support structure for GT performance and enhancing the life of combustion filter of M/s Gatro Power Ltd., Hub District Lasbela, Balochistan.

Client: Gatro Power Limited

Location: HUB, Balochistan


Project Name: Gas Turbine Filter Intake House 5.7MW Taurus T-60

Challenges & Problems Faced by Client:

The dusty environment was the root cause of frequent change of Combustion filters installed at Gas Turbine Air intake at Artistic Milliners Karachi. Heavy Dust load on the air filters caused a sharp increase in pressure drop, consequently, frequent change of filters was indispensable. This condition was quite challenging for them because of the increased outage time of the machine.

SAF Design & Solution:

A dynamic team of SAF International presented a solution to optimize the Gas Turbine intake, Retrofitting of Pre-Filter at Solar Turbines Turbomach Gas Turbine Taurus T-60 5.7MW complete single-stage filter house with Louvers steel support structure for GT performance and enhancing the life of combustion filter of M/s Artistic Milliners, Karachi.

Client: Artistic Milliners

Location: Karachi, Pakistan


Project Name: GT Air Intake House 220MW X 3 Frame 9E Gas Turbine

Challenges & Problems Faced by Client:

Proper air filtration is critical to the overall performance and reliability of gas turbines. Small gains in efficiency can mean huge savings. Gas Turbines Air intake at KGTPS Karachi faced dusty and humid environment that brought about frequent replacement of filters installed at heavy dust mist load on the air filters caused a sharp increase in pressure drop, consequently, frequent change of filters was indispensable. This condition was quite challenging for K-Electric because of the increased outage time of the machine.

SAF Design & Solution:

The dynamic Team of SAF International presented a solution to optimize the Gas Turbines Air intake. SAF enables K-Electric to overcome the challenge. Retrofitting at General Electric LM 6000 Gas Turbine was another achievement of SAF International. operational savings achieved through improved filtration performance greatly reduced maintenance costs as a result of a much cleaner engine, quantified by less frequent inspections, fewer shutdowns, and higher availability.

Client: K-Electric

Location: Karachi, Pakistan


Project Name: Gas Turbine Filter Intake House 225MW x 1 Frame 9E

Challenges & Problems Faced by Client:

The dusty environment was the root cause of frequent change of filters installed at Gas Turbine Air intake at M/s Engro Powergen. Heavy Dust load on the air filters caused a sharp increase in pressure drop, consequently, frequent change of filters was indispensable. This condition was quite challenging for them because of the increased outage time of the machine.

SAF Design & Solution:

A dynamic team of SAF International presented a solution to optimize the Gas Turbine intake, retrofitting at GE Frame 9E Gas Turbine was another milestone of SAF International. Retrofitting services in M/s Engro Powergen Ltd. for Pre-Filter single-stage filter house with a steel support structure for optimum filtration.

Client: Engro Powergen.

Location: Ghotki, Sindh, Pakistan


Project Name: Gas Turbine Enclosure Modification EGT-4 Siemens

Challenges & Problems Faced by Client:

OGDCL Gas Field faces stormy and dusty environments. Heavy Dust was passing through the existing air filters arrangement from weather hood & Inlet duct of Turbine Enclosure Ventilation of SIEMENS (EGT-4) Gas Turbine at Uch Gas Field Jacobabad, Balochistan. The existing spin tube filters were not working properly. This condition was quite challenging for the increased outage time of the machine and cleaning.

SAF Design & Solution:

SAF International Modified weather hood & Inlet duct for the Turbine Enclosure Ventilation System of SIEMENS Gas Turbine (EGT-4). Successfully replaced existing spin tube filters with SAF Pre Filters for smooth operation at a low-pressure drop.

Client: OGDCL UCH Gas Field

Location: Deira Bughti, Pakistan


Project Name: Gas Turbine Filtration 235MW (1x80 MW,1x155 MW)

TNB Liberty Power Limited (235 MW) Power Plant in Mirpur Mathelo, Daharki, Sindh, is wholly owned by TNB Power Dahrki Ltd. GT operation team TNB liberty power has a serious problem due to the frequent change of Air Filters back in 2002. This not increased the replacement cost of final stage filters but also reduced the efficiency of the machine due to frequent shutdowns

SAF Design & Solution:

SAF optimized air intake system and resolved the issue. This retrofitting with the consent of Ansaldo brought remarkable improvement. SAF solution played a vital role in increasing the efficiency of GT and reduced the replacement frequency of the secondary final stage filter of Siemens V94.2 Gas Turbine

Client: TNB Liberty Power Limited

Location: Daharki, Pakistan


Natural Natural Natural